Site Search Results
About 639 results (0.93 seconds)
- newSHS 2010-11 CNSTRCTN POS
- https://www.pcc.edu/wp-content/uploads/sites/38/teachers/POS/approved-pos/documents/SherwoodConstructionPOSApplication2011.pdf
- CTE POS Application—April 2011 1 Office of Educational Improvement and Innovation Public Service Building 255 Capitol Street NE Salem, OR 97310-0203 503-947-5600 Fax …
- Draft | Guidelines for Sustainable Purchasing | 2022.9.22
- https://www.pcc.edu/sustainability/wp-content/uploads/sites/22/2021/10/Characteristics-of-Sustainably-and-Socially-Responsibly-Purchased-Goods-and-Services-2022.12.1.pdf
- Introduction This document is a list of c haracteristics and attributes of sustainable goods and services, which align with PCC Mission and Values , PCC’s policies on solid …
- CURRA_6_1_11
- https://www.pcc.edu/wp-content/uploads/sites/141/curriculum-committee/documents/CURRA_6_1_11.pdf
- CURRICULUM/GEN ED COMMITTEE a standing committee of the Education Advisory Committee Agenda June 1, 2011 Sylvania CC, Conference Rm B Information Items from the Curriculum …
- 18-026.pdf
- https://www.pcc.edu/wp-content/uploads/sites/165/minutes/resolutions/documents/17-18/18-026.pdf
- 57 August 11 , 2017 1 8-026 ACCEPT PROPOSAL AND AWARD THE CONTRACT FOR FACILITIES MANAGEMENT SERVICES (FMS) CONSTRUCTION PROJECT MANAGEMENT ASSISTANCE TO PLAN B CONSULTANCY …
- 18-074.pdf
- https://www.pcc.edu/wp-content/uploads/sites/165/minutes/resolutions/documents/17-18/18-074.pdf
- December 14, 2017 18- 074 BID AWARD – GENERAL CONTRACTOR SERVICES FOR THE WILLOW CREEK CENTER – MECHATRONICS PROGRAM REMODEL PREPARED BY: Sandy Wanner, Buyer/Contract …
- 18-078.pdf
- https://www.pcc.edu/wp-content/uploads/sites/165/minutes/resolutions/documents/17-18/18-078.pdf
- January 18 , 201 8 18-078 BID AWARD – GENERAL CONTRACTOR SERVICES FOR THE DOWNTOWN CENTER THIRD FLOOR RENOVATION PREPARED BY: Linda Degman , Director , Bond Program FINANCIAL …
- 18-107.pdf
- https://www.pcc.edu/wp-content/uploads/sites/165/minutes/resolutions/documents/17-18/18-107.pdf
- April 19, 2018 1 8-107 AUTHORIZATION TO INCREASE THE ANTICIPATED SPEND FOR THE CM/GC CONTRACT FOR THE RENOVATION OF COLLEGE SERVICES BUILDING PREPARED BY: Tina Parkvold, …
- February 15, 2001
- https://www.pcc.edu/wp-content/uploads/sites/165/minutes/resolutions/documents/15-16/16-059.pdf
- January 21, 2016 1 6-059 AUTHORIZE AN INCREASE TO OPSIS ARCHITECTURE ’S CONTRACT TO PROVIDE ARCHITECTURAL SERVICES FOR ROCK CREEK CAMPUS 2008 BOND PROGRAM PREPARED BY: …
- November 20, 2008
- https://www.pcc.edu/wp-content/uploads/sites/165/minutes/resolutions/documents/15-16/16-127.pdf
- June 16, 2016 16-127 AUTHORIZE THE DEPARTMENT TO CONTRACT WITH CONTRACTORS AND SUPPLIER FOR THE SYLVANIA CAMPUS PERFORMING ARTS CENTER MINOR REMODEL PREPARED BY: Avelina …
- November 20, 2008
- https://www.pcc.edu/wp-content/uploads/sites/165/minutes/resolutions/documents/14-15/15-030.pdf
- August 21, 2014 1 5-03 0 DELEGATE AUTHORITY TO COLLEGE PRESIDENT TO NEGOTIATE TERMS AND CONDITIONS FOR PURCHASE OF REAL PROPERTY NEAR SOUTHEAST CAMPUS PREPARED BY: Linda …