Art faculty creates large 'Cumulus' 2 comments for post 16725
She took over the entire gallery space to produce the work as interested visitors could come by and watch her put it all together Posted March 7, 2013
MEDIA: President finalists in news
Here is a look at some of the news stories about PCC from around the local area and the nation in February Posted March 6, 2013
New underground garage will provide 210 stalls, The construction site is about 200 ft by 300 ft in size Parking at Cascade Campus goes underground
March 5, 2013 Written by Gina Whitehill Baziuk Construction began last December on a 210-space underground parking garage between N. […] Posted March 5, 2013
Free tickets for Linus Pauling series 2 comments for post 16642
he lecture is titled, “The Hunt for Earth 2: A Shower of Kepler Planets,” by Gibor Basri from the University of California – Berkeley at 7 p.m., Friday, March 8 at the First Congregational Church on the Park Blocks in downtown Portland Posted March 1, 2013
Finalists for president chosen 5 comments for post 16615
Candidates Jeremy Brown, Tod Burnett, and Richard Durán were picked from a nationwide search Posted February 28, 2013
PCC welcomes noted forestry expert
Ward is presenting on the topic 'Land conservation and Permaculture Connect in Social Forestry' as a fundraising event for the non-profit Speak for the Trees Posted February 28, 2013
'Blithe Spirit' opening at Sylvania 5 comments for post 16603
A recently remarried Charles calls a madcap psychic, Madame Arcati, to his lovely home for a mock séance Posted February 27, 2013
Famed Filipino leader speaks at PCC
Philippine Congressman Walden Bello made his debut as a political activist during the Marcos dictatorship when he dedicated two decades to building an international movement to restore democracy in the Philippines Posted February 27, 2013
PCC chapter wins AAWCC recognition
The college's chapter president, Cherie Maas-Anderson, applied for, and won, the national model chapter award for bringing women's issues to the forefront Posted February 27, 2013
Rock Creek Campus lays a 300 cubic yard foundation
Early morning, February 20,  the Fortis Construction crews poured 300 cubic yards of concrete over a 14,000 square foot pad, […] Posted February 26, 2013