Future Rock Creek

Future Rock Creek banner

Built for community, shaped by you

Future Rock Creek is a transformative campus project that will reimagine the student experience in Building 2 and what the broader campus can be in the future.

This work is just getting started and we want to hear from you! Tell us – what do you love about Rock Creek?

Share your thoughts

Building 2 and beyond

Map showing where Building 2 is on campusWe’re exploring how Building 2 (B2) can best serve students on campus and accommodate modern tools, technology, and safety needs. As we look closer at Building 2, we’re also addressing the overall campus and how we can enhance circulation and access to outdoor spaces.

This redevelopment will prioritize learning environments, land stewardship, and collaboration, while focusing on advancing sustainability and equity throughout the process. Early goals for this project address the needs of programs and services on the Rock Creek Campus:

  • Improve the programmatic space at Building 2, which houses Career Technical Education (CTE) Programs such as Automotive Collision Repair, Building Construction, and Diesel, along with computer labs, general academic programs, student resource centers, collaboration spaces, and staff office and meeting areas.
  • Expand access to the outdoors by enhancing views to the surrounding natural environment while providing more equitable spaces to support learning.
  • Increase wayfinding, accessibility, safety, and stormwater mitigation to strengthen campus connectivity and enhance the overall campus experience.
  • Enhance collaboration spaces and a variety of learning environments to promote student interaction and skills exchange.
Phase 2: Design

The Future Rock Creek timeline has four major phases: vision, design, build, and open. Each one is designed to build upon feedback received from the PCC community and key stakeholders that will inform the next phase.

During the vision phase, students, faculty, and staff helped identify priorities and opportunities for the future of Rock Creek Campus. A steering committee was also established and continues to meet regularly to help guide project planning and decision-making.

The project is now in the design phase, where those ideas and priorities are being translated into detailed plans for future improvements that are within the project budget. Current work includes design development for a new Building Construction Technology (BCT) facility, a major multi-phase renovation of Building 2 (B2), and phased swing space improvements that will support future construction activities. Throughout this phase, the project team will continue engaging with students, faculty, staff, and community members to help inform landscape design, wayfinding and navigation, restroom design, art, and environmental graphic design as plans are refined and prepared for construction.

Timeline: vision (2025), design (2026), build (2027-33), open (2031-33)

From feedback to design

Staff member talking to a community member at an engagement eventCommunity engagement continues to play an important role in shaping the Future Rock Creek project. Through workshops, campus events, and ongoing conversations, students, faculty, staff, and community members have shared feedback on how campus spaces can better support learning, wellbeing, accessibility, and belonging.

Key themes have included preserving Rock Creek’s connection to nature, creating welcoming and easy-to-navigate spaces, improving opportunities for collaboration and study, and designing environments that support a wide range of physical, sensory, and cultural needs. These insights continue to inform project planning and design development as the team works to create spaces that support student success and strengthen the campus experience for all.

CTE Industry research in action

Career and Technical Education (CTE) is dedicated to equipping students with the essential skills needed for successful career entry, professional growth, and continuing education.

PCC has been hard at work with CTE industry experts, employers, and community colleges across the country to gather feedback and best practices for the design of Building 2. Combined with faculty input, this research provides the Steering Committee with insights to help shape the design of new spaces for automotive, diesel, and construction programs. The research highlights what matters most: strong core skills, safer and more flexible spaces, and readiness for emerging technologies.

Learn more about Career and Technical Programs at PCC.

Project team
  • PCC Office of Planning and Construction
  • Bora Architecture & Interiors with DAO Architecture and Curious Architects
  • Fortis Construction
The future is ours – let’s build it together

Whether it’s the view, the vibe, or the farm animals – we want to hear what you love about Building 2 and the Rock Creek Campus.

Sign up to stay connected!

FAQs
When will the project be completed?

This project will be completed in phases over the next 5 to 9 years, by 2033. We will share more details about timelines as we move through the preconstruction work with our design and construction team.

When will construction start?

This project is currently in the design phase. We anticipate the new BCT building to begin construction in early 2027 and be completed by summer 2028. Major construction on phase 1 of B2 will begin in summer 2028, with phase 1 completed by summer 2030, and phase 2 started in the fall of 2030 and completed by summer 2032.

Will I have an opportunity to give input on the design?

There will be multiple opportunities for students, faculty, and staff to provide input and feedback on the future plans for Rock Creek. Programs currently in Building 2 will have opportunities to provide input on their space needs, and the campus at large will be invited to share feedback during planning, schematic design, and design development as the details of the project come together over the next two years. Discussions will cover space requirements, including the types and locations of needed areas. Please visit the engagement wall on the first floor of Building 2 for more information and opportunities to provide input via QR code links.

How will the design process engage students and community members?

The Office of Planning and Construction will be hosting events open to faculty, staff, students, and visitors to ensure the community has ongoing opportunities to learn about the Future Rock Creek project. We will be actively seeking feedback, and engagement will integrate the experiences of communities most impacted to ensure that decisions about future spaces reflect students’ needs and interests.

What are Career and Technical Education (CTE) programs?

Career and Technical Education (CTE) is dedicated to equipping students with the essential skills needed for successful career entry, professional growth, and continuing education. These skills are both transferable and job-specific, complementing general education while fostering a strong foundation for lifelong learning. CTE programs at Rock Creek include the Vet-Tech, Landscape Tech, Welding, Aviation, Diesel, Auto Collision Repair, and Building Construction Technology, among others.

What about trees on the Rock Creek Campus?

Trees on campus are an invaluable part of the Rock Creek community. The Landscape Technology programs spend many classes visiting individual trees and shrubs on campus to learn about their features, growing habits, botanical names, and habitat needs. As we plan for project-related changes to the campus, tree protection and new tree plantings will be especially important for our design and construction teams to consider.

How will you ensure that the Future Rock Creek project will protect and elevate the community’s access to nature?

Connections to nature are treasured at this campus. Building 2 faces the north edge of campus toward the wetlands, and the team is working toward enhancing the accessibility of this viewpoint, both from the building interior and from the existing fountain plaza.

Will this project’s development be eco-friendly?

Future development of PCC’s Rock Creek Campus will be driven by climate justice. With input from PCC staff, students, and the broader community, this project will develop and track measurable goals around energy, carbon, water, waste, air quality, and resiliency in alignment with PCC’s Climate Action Plan. This project is an important step in realizing a carbon-neutral PCC. The B2 project will also seek LEED Silver certification. This project aspires to celebrate and expand the living laboratory that is PCC’s Rock Creek Campus.

What will happen to the art collection in Building 2?

Art collections will be temporarily relocated or stored during redevelopment. The college will identify any need for additional artwork, and if necessary, conduct an art procurement process.

Who do I contact if I have a question?
Project manager

Casey Hagerman, Senior Project Manager
casey.hagerman@pcc.edu
971-722-8455

Timeline
  • Construction begins: Early 2027
  • Grand opening:
    • BCT – Fall 2028
    • B2 – Fall 2032