All-user restroom locations at PCC

See PCC’s Accessible Building Features Map for a floor plan of these locations.

Cascade

  • Cascade Hall
    • 1 on second floor
  • Jackson Hall
    • 1 across from room 217
  • Library
    • 1 on first floor, next to entrance and other bathrooms
    • 1 on second floor, next to room 203
  • Moriarty Arts & Humanities Building
    • 1 multi-stall on second floor
  • Paragon
    • 2 single-occupant restrooms on main floor
  • Physical Education Building
    • 2 single-occupant locker rooms with shower on first floor
  • Student Services Building
    • 2 on third floor, NW corner of building
  • Student Union
    • 1 single-occupant on first floor
    • 1 multi-stall restroom on the 2nd floor across from the elevator
    • 2 single-occupant on third floor
  • Technology Education Building (TEB)
    • 1 multi-stall on first floor
  • Terrell Hall
    • 1 multi-stall on second floor

Rock Creek

  • Building 1 (Staff Access Only – Facilities – Coming Soon!)
  • Building 2
    • 1 multi-stall on second floor
  • Building 3
    • 2 on first floor
    • 1 on second floor
  • Building 4
    • 1 multi-stall on main floor
    • 1 single-occupant on main floor
  • Building 5
    • 1 on first floor
    • 1 on second floor
    • 2 single-occupant locker rooms with a shower on first floor
  • Building 7
    • 1 between rooms 116 and 117
  • Building 9
    • 1 across from room 116 (in counseling department)
  • Kennel
    • 1 on first floor
  • West Campus (near barn)
    • 1 multi-stall restroom near cafe
  • New Barn Coming Soon with 2 single-occupant restrooms!

Southeast

  • Administration Hall:
    • 2 on first floor, next to room 109
    • 1 on second floor, across from room 202
    • 1 on third floor, across from room 304
    • 1 on fourth floor, near room 403
  • Community Hall
    • 1 on first floor
  • Library
    • 1 multi-stall on first floor
    • 2 on third floor, east end of building, next to room 312
  • Student Commons
    • 1 on second floor, north end of building, around corner from room 213
    • 1 on third floor, north end of building, around corner from room 313
  • Mt. Scott Hall
    • 1 multi-stall restroom on second floor
  • Mt. Tabor Hall
    • 1 multi-stall restroom near cafe

Sylvania

  • AM building (Future Site – 2030s)
    • 1 planned as part of the PCC Bond, not yet built
  • CC building
    • 1 single-occupant on second floor, south of cafeteria near stairs
    • 1 on first floor, below the QRC, multi-stall
  • CT building
    • 4 single-occupant on second floor, room 215. Go down the hall, make a right. Down that hall on your right hand side are 4 restrooms.
  • College Services Building
    • 2 single-occupant on first floor
    • 1 single-occupant on second floor
  • HT building (HT West under construction – More Coming in 2025!)
    • 2 single-occupant locker rooms with shower on pool deck accessible through room 103
    • 2 multi-stall on second floor
    • 1 all-user shower room on second floor
    • 1 multi-stall on third floor
  • Library
    • 1 multi-stall on first floor
  • ST building
    • 1 on second floor
  • TCB building
    • 1 on second floor, northwest corner next to gendered bathrooms

CLIMB Building

  • 1 multi-stall on 2nd floor

Downtown Center

  • 1 on 1st floor, next to room 116
  • 2 in basement, next to room B010 (shower)
  • 1 on 4th floor

Newberg Center

  • 1 on west end of building next to vending machines

Swan Island

  • 1 multi-stall on the main floor

Opportunity Center at 42nd Ave

  • 1 single-occupant on first floor

Willow Creek Opportunity Center

  • 1 on third floor next to elevator